Value Stream Mapping for Warehouse Process in Automotive Manufacturing Case

Authors

  • Deri Maryadi Universitas Tridinanti, Indonesia
  • R.A Nurul Moulita Universitas Tridinanti, Indonesia
  • Marthin Luther King Universitas Tridinanti, Indonesia
  • Rita Maria Veranika Universitas Tridinanti, Indonesia
  • Madagaskar Madagaskar Universitas Tridinanti, Indonesia

DOI:

https://doi.org/10.35335/computational.v13i3.199

Keywords:

KD Parts Warehouse, Lean, NVA & NNVA, Process Mapping Analysis, Value Stream Mapping

Abstract

KD parts warehouse is a transit and connection place before the KD parts (Knock Down) car’s body and material from Automotive manufacturing, to export destination in several countries or destination. The faster the warehouse operation process will make the company's export performance better. This research aims to reduce NVA and NNVA activities' concern in warehouse KD operations in Japanese automotive manufacturers in Cikarang. The application of lean thinking with the VSM (Value Stream Mapping) approach eliminates the waste of activities and processes in the KD warehouse. From the CVSM and PMA (Process Mapping Analysis) results, the work efficiency is 63%, with NVA time of 244.5 minutes and an NNVA time of 471 minutes. In the future state map, the work efficiency becomes 82% due to kaizen improvement, re-layout, and process redesign in the warehouse, with the total NVA become zero and NNVA reduce to 177 minutes.

References

Abideen, A., & Mohamad, F. B. (2020). Improving the performance of a Malaysian pharmaceutical warehouse supply chain by integrating value stream mapping and discrete event simulation. Journal of Modelling in Management. https://doi.org/10.1108/JM2-07-2019-0159

Abideen, A. Z., & Mohamad, F. B. (2019). Supply chain lead time reduction in a pharmaceutical production warehouse – a case study. International Journal of Pharmaceutical and Healthcare Marketing, 14(1), 61–88. https://doi.org/10.1108/IJPHM-02-2019-0005

Azhari, Hermanto, dan. Maryadi D (2024). Analisa Defect pada Proses Bongkar Muat Produk Pelumas Kemasan Box di PT. Pertamina Lubricants Depot Supply Chain Point Kertapati Palembang Defect Analysis in the Process of Loading and Unloading Boxed Lubricant Products at PT. Pertamina Lubricants Depot . 02, 27–31.

Alicke, K., & Lösch, M. (n.d.). Lean and mean : How does your supply chain shape up ? 1–15.

Anđelković, A., Radosavljević, M., & Stošić, D. (2017). Effects of Lean Tools in Achieving Lean Warehousing. Economic Themes, 54(4), 517–534. https://doi.org/10.1515/ethemes-2016-0026

Arturo, J. (2020). Lean and green – a systematic review of the state of the art literature.

Dhinar, A., ;Wardhani, F. A., & ;Maryadi, D. (2023). Analisis Pengendalian Persediaan Barang Gudang Ban Luar dan Ban Dalam Menggunakan Metode Economic Order Quantity (EOQ). JIETRI: Journal Of Industrial Egineerig Tridinanti, 01(01).

Ekawati, N., & Lestari, D. S. (2023). Rancangan Sistem Informasi Penelitian Di Politeknik TEDC Bandung. Journal of Informatics and Electronics Engineering, 3(1), 19–24.

Guzmán, A. M. V., González, K. M. M., Canales, M. F., Garza, M. T. V., & de la Rosa, F. B. (2018). Design of a centralized warehouse layout and operation flow for the automotive industry: A simulation approach. Proceedings of the International Conference on Industrial Engineering and Operations Management, 2018(JUL), 2572–2584.

Marwan, A., Anderson, G., Tamalika, T., Maryadi, D., Ardaisi, M., Ahli, T., Palembang, K., Studi, P., Sipil, T., Teknik, F., Taman, U., & Palembang, S. (2024). OPTIMASI WAKTU PELAKSANAAN PADA MANAJEMEN PROYEK PEMBANGUNAN GEDUNG POLTEKKES JURUSAN FARMASI TAHAP 1 DENGAN METODE CPM DAN PERT OPTIMIZATION OF IMPLEMENTATION TIME IN PROJECT MANAGEMENT CONSTRUCTION OF THE HEALTH POLYTECHNIC BUILDING DEPARTMENT OF PHARMA. 02.

Maryadi,D. T,Tamalika. Hermanto MZ, Azhari. Ardaisy M. (2023). Improvement Performa Gudang Medium Mile dengan Menggunakan Value Stream Mapping Case Study : Warehouse Medium Mile di Kota Palembang. 3(1), 40–48.

Maryadi, D., Tridinanti, U., Moulita, R. A. N., Tridinanti, U., Suryani, F., Tridinanti, U., Tridinanti, U., Tamalika, T., Tridinanti, U., Palembang, K., Enterprises, M., Improvement, C., Mikro, U., & Maryadi, D. (2024). SOSIALISASI PENERAPAN CONTINUOUS IMPROVEMENT ( KAIZEN ) PADA UMKM PERCETAKAN AL-TISYAH DI KOTA. 2(1), 97–103.

Maryadi, D. (2021). Lean Six Sigma DMAIC Implementation to reduce Total Lead Time Internal Supply Chain Process. 2086–2096.

Maryadi, D., Tamalika, T., Moulita, R. A. N., & Sianipar, T. P. O. (2024). IMPLEMENTASI QUALITY FUNCTION DEPLOYMENT ( QFD ) PADA USAHA KECIL MENENGAH ( UKM ) ANGKRINGAN. 12, 140–146.

Maulana, Y. (2019). Identifikasi waste dengan menggunakan metode value stream mapping pada industri perumahan. Journal of Industrial Engineering and Operation Management (JIEOM), 2(2).

Muhali, M., Asy’ari, M., Prayogi, S., Samsuri, T., Karmana, I. W., Sukarma, I. K., Mirawati, B., Firdaus, L., & Hunaepi, H. (2019). Pelatihan kegiatan penelitian dan penulisan karya ilmiah bagi Guru Madrasah Aliyah Negeri 3 Lombok Tengah. Abdihaz: Jurnal Ilmiah Pengabdian Pada Masyarakat, 1(1), 28–36.

Nayak, R., & Choudhary, S. (2022). Operational excellence in humanitarian logistics and supply chain management through leagile framework: a case study from a non-mature economy. Production Planning and Control, 33(6–7), 606–621. https://doi.org/10.1080/09537287.2020.1834135

Oey, E., & Nofrimurti, M. (2018). Lean implementation in traditional distributor warehouse - A case study in an FMCG company in Indonesia. International Journal of Process Management and Benchmarking, 8(1), 1–15. https://doi.org/10.1504/IJPMB.2018.088654

Pattanawasanporn, P. (2014). Logistics and Supply Chain Management Approach to SMEs in Noodle Factory Industry - Lean and Six Sigma Tool. 3105–3118.

PENGUSUL, T. I. M. (n.d.). JUDUL PENELITIAN.

Pereira, C. M., Anholon, R., Rampasso, I. S., Quelhas, O. L. G., Leal Filho, W., & Santa-Eulalia, L. A. (2020). Evaluation of lean practices in warehouses: an analysis of Brazilian reality. International Journal of Productivity and Performance Management. https://doi.org/10.1108/IJPPM-01-2019-0034

Prasetyawan, Y., Simanjuntak, A. K., Rifqy, N., & Auliya, L. (2020). Implementation of lean warehousing to improve warehouse performance of plastic packaging company. IOP Conference Series: Materials Science and Engineering, 852(1). https://doi.org/10.1088/1757-899X/852/1/012101

Reis, A., Stender, G., & Maruyama, U. (2017). Internal logistics management: Brazilian warehouse best practices based on lean methodology. International Journal of Logistics Systems and Management, 26(3), 329–345. https://doi.org/10.1504/IJLSM.2017.081965

Ridwan, A., Arina, F., & Permana, A. (2020). Peningkatan kualitas dan efisiensi pada proses produksi dunnage menggunakan metode lean six sigma (Studi kasus di PT. XYZ). TEKNIKA: Jurnal Sains Dan Teknologi, 16(2), 186–199.

Tamalika, T., Maryadi, D., Mz, H., Fuad, I. S., Alamsyah, D. M. N., & Palembang, U. T. (2022). Analisis Penjadwalan Ulang Proyek Power House pada Rumah Sakit dengan Metoda PERT, CPM dan Fishbone Diagram (Studi Kasus Pada Kontraktor Di Kota Palembang). Prosiding Seminar Nasional Mercu Buana Conference on Industrial Engineering, 4(June), 164–172.

Downloads

Published

2024-11-30

How to Cite

Maryadi, D., Moulita, R. N., Luther King, M., Maria Veranika, R., & Madagaskar, M. (2024). Value Stream Mapping for Warehouse Process in Automotive Manufacturing Case. International Journal of Mechanical Computational and Manufacturing Research, 13(3), 89–97. https://doi.org/10.35335/computational.v13i3.199